BOULDER CREEK, California — Friday, November 20, 2026, late-morning update. Caltrans District 5 says two Highway 9 bridge replacement projects north of Boulder Creek will continue with around-the-clock signalized one-way traffic during Thanksgiving week. The affected projects are at King’s Creek Bridge (postmile 15.41–15.55) and San Lorenzo River Bridge (postmile 13.58–13.69).
What is documented and what is forecast
Caltrans says short-term daytime and overnight construction closures elsewhere on Highway 9 must be reopened by noon Tuesday November 24 for the holiday week, but the 24/7 temporary bridge signals will remain in place. The Kings Creek project is replacing the northbound portion and the San Lorenzo River bridge project is replacing the southbound portion.
Local implications and uncertainties
Motorists traveling north from Boulder Creek or south toward Santa Cruz should distinguish temporary short-term lane closures from ongoing one-way bridge signals. Expect delays at the lights and watch for rain-damaged shoulders. This is a construction traffic notice, not a new claim that the bridge has failed.
Where to verify what happens next
Check the relevant official alert or road authority for new instructions before changing travel plans or returning to a low-lying area. Caltrans QuickMap provides California highway restrictions; NWS publishes updated hazard messages, and Humboldt Alert serves affected north-coast communities. An evacuation warning is not a mandatory evacuation order. The presence of a forecast does not establish flooding or a road closure at each address.
Sources and photo note
Primary source: Caltrans District 5 November 19 Highway 9 construction notice. Publication date November 20, 2026. The cover image is a generic weather illustration from the California58 media library; it is not a verified photograph of the specific local event.
Support Boulder Creek News
Choose how to support Boulder Creek News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Boulder Creek News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Boulder Creek News
- Boulder Creek Flood Advisory Expired November 19: What Morning Storm Rain Means for Roads →
- Thanksgiving in Boulder Creek: Plan a visit to Big Basin Redwoods State Park →
- Big Basin’s 153-Acre NoraBella Expansion Sets Up a New Gateway After the 2020 Fire →
- Big Basin Closed for November 18 Windstorm; November 19 Reopening Depends on Damage Inspection →
- Boulder Creek and Brookdale Roads on Santa Cruz County’s 2026 Resurfacing List: Six Streets Named →

COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.