BOULDER CREEK / BROOKDALE, Santa Cruz County — October 27, 2026. Residents following deteriorating neighborhood streets can consult a new county-specific resource rather than relying solely on the separate Highway 9 bridge project. The 2026 Santa Cruz County Pavement Management Project includes road resurfacing in the Boulder Creek and Brookdale area, with six named streets on the county’s published list.

Which roads appear in the plan?

The county’s dedicated construction page lists Irwin Way, Alameda Avenue, Berkeley Way, Larkspur Street, Riverside Road and Fern Street under Boulder Creek and Brookdale. It also identifies resurfacing work in Soquel, Aptos and Watsonville. Readers should check the detailed project-road list to learn the exact segment limits and intended pavement treatment; the presence of a street name does not mean its full length is being rebuilt.

Does the list mean work is complete?

No. The county project page describes construction scheduling as pending completion and refers residents to the individual project-road listing and construction notices. Until a specific date and work limits are posted, California58 is not reporting active closure dates for these six streets or claiming pavement has been installed.

Road resurfacing differs from the Highway 9 San Lorenzo River and Kings Creek bridge replacement works, which involve bridge reconstruction and temporary traffic signals. Residents should avoid conflating the two projects when planning school pickup, deliveries or commuting.

How to check road impacts

Santa Cruz County offers an email list for road-impact notifications. Residents can subscribe and check individual project updates before driving. Questions can be addressed to Public Works at 831-454-2160 or dpwweb@santacruzcounty.us.

Primary sources: Santa Cruz County’s 2026 Pavement Management Project and the county roadworks information hub.

For related reporting, see Highway 9 bridge reconstruction and Boulder Creek News.

Editor’s note: The six streets are listed in an official 2026 project plan. Work schedules and individual construction status require up-to-date confirmation.

YOUR LOCAL NEWSPAPER NEEDS YOU

Help this community newspaper grow

Your support helps build coverage for the people and places this local newspaper serves.

Donate once by card ↗
Help Boulder Creek News grow Help strengthen reporting on Boulder Creek: community voices, important decisions and local life.
Support Boulder Creek News

Choose how to support Boulder Creek News:

Credit / Debit Card via Stripe

Choose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Boulder Creek News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
Optional support through the publisher. Contributions are not advertised as tax-deductible and never buy editorial influence.

Boulder Creek News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Boulder Creek News newsroom →

More from Boulder Creek News

Visit Boulder Creek News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.