BOULDER CREEK, California — Friday, November 20, 2026, late-morning update. Caltrans District 5 says two Highway 9 bridge replacement projects north of Boulder Creek will continue with around-the-clock signalized one-way traffic during Thanksgiving week. The affected projects are at King’s Creek Bridge (postmile 15.41–15.55) and San Lorenzo River Bridge (postmile 13.58–13.69).

What is documented and what is forecast

Caltrans says short-term daytime and overnight construction closures elsewhere on Highway 9 must be reopened by noon Tuesday November 24 for the holiday week, but the 24/7 temporary bridge signals will remain in place. The Kings Creek project is replacing the northbound portion and the San Lorenzo River bridge project is replacing the southbound portion.

Local implications and uncertainties

Motorists traveling north from Boulder Creek or south toward Santa Cruz should distinguish temporary short-term lane closures from ongoing one-way bridge signals. Expect delays at the lights and watch for rain-damaged shoulders. This is a construction traffic notice, not a new claim that the bridge has failed.

Where to verify what happens next

Check the relevant official alert or road authority for new instructions before changing travel plans or returning to a low-lying area. Caltrans QuickMap provides California highway restrictions; NWS publishes updated hazard messages, and Humboldt Alert serves affected north-coast communities. An evacuation warning is not a mandatory evacuation order. The presence of a forecast does not establish flooding or a road closure at each address.

Sources and photo note

Primary source: Caltrans District 5 November 19 Highway 9 construction notice. Publication date November 20, 2026. The cover image is a generic weather illustration from the California58 media library; it is not a verified photograph of the specific local event.

Help Boulder Creek News grow Help strengthen reporting on Boulder Creek: community voices, important decisions and local life.
Support Boulder Creek News

Choose how to support Boulder Creek News:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Boulder Creek News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

Boulder Creek News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Boulder Creek News newsroom →

More from Boulder Creek News

Visit Boulder Creek News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.